Skyven is built with three linked technologies. Mivan aluminium formwork casts the walls and floors in concrete. RCC shear walls hold the tower firm against wind and earthquakes. An RCC raft foundation spreads the weight of all 63 floors into the ground. This guide explains how each one works, in plain words, and what it means for you as an owner.
Skyven’s structure at a glance
| Part | What the developer lists | What it does |
|---|---|---|
| Formwork | Mivan construction | Casts concrete walls and slabs together, floor after floor |
| Walls | RCC shear wall technology | Resists sideways loads from wind and earthquakes |
| Foundation | RCC raft foundation | Spreads the tower’s weight over a wide area |
| Height | 63 floors, 755 ft | |
| Below ground | 4 cellars | |
| Floor-to-floor height | 12 ft on residential floors |
RCC means reinforced cement concrete: concrete with steel bars inside. Concrete is strong when squeezed. Steel is strong when pulled. Together they handle both.
What is Mivan construction
Mivan is a common name in India for aluminium formwork. Formwork is the mould that holds wet concrete in shape until it sets.
In older buildings, builders cast columns and beams first. Then they filled the gaps with brick walls. In a Mivan building, the concrete walls and the floor slab are cast in one go.
The Building Materials & Technology Promotion Council (BMTPC), a body under the Union housing ministry, describes this “monolithic” method. Walls, floors, slabs, stairs, and door and window openings are cast in place in one operation. The structure is treated as shear wall type construction.
How it works, step by step
- Steel goes in. Workers tie the steel bars for the walls and the slab.
- Panels go up. Light aluminium panels are pinned together around the steel. They form both faces of every wall and the underside of the slab.
- Pipes and conduits go in. Electrical and plumbing lines are placed inside the mould before the pour.
- Concrete is poured. The walls and the slab fill in a single pour.
- Panels come off. Once the concrete is strong enough, the panels are stripped and lifted to the next floor.
The same set of panels repeats floor after floor. That suits a tower like Skyven, where the typical floor repeats many times.
Pros and cons of Mivan
Pros
- Speed. The BMTPC profile says a slab cycle of about 3 days can be achieved. That cuts construction time.
- Accuracy. Factory-made panels give straight, even walls and consistent room sizes on every floor.
- Fewer joints. Walls and slabs are one piece of concrete. There are fewer joints between brick and frame, which may mean fewer cracks at those joints.
- Smooth finish. The concrete surface often needs little plaster before finishing.
- Strength. The concrete box acts as one unit, which helps the building resist sideways forces.
Cons
- No later changes. BMTPC notes that alterations after construction are not possible. You cannot simply knock down or move a wall.
- Services fixed early. All electrical and plumbing lines must be planned before the pour. Adding new points later is harder.
- Lead time. The formwork is designed and made for each project. BMTPC notes a lead time of about three months before work starts.
- Heat. Concrete passes heat more easily than brick. BMTPC advises good ventilation planning in such homes.
- Drilling. Walls are reinforced concrete. Hanging shelves or art needs the right drill and care to avoid hidden pipes and wires.
What is an RCC shear wall
A shear wall is a stiff wall built to resist sideways forces. Wikipedia’s entry defines it as part of a structure designed to resist in-plane lateral forces, typically wind and seismic loads.
Think of a tall tower in a strong wind. The wind pushes sideways on the whole face of the building. The taller the tower, the larger that push. Shear walls act like deep, upright beams. They take the sideways load and carry it down into the foundation.
In tall buildings, shear walls often form a core around the lifts and stairs. This core is one of the stiffest parts of the tower. Skyven’s typical floor has a central core with nine lifts and two staircases. The developer describes the Skyven shear walls as earthquake and wind resistant.
What it means for you
- Stiffness. Shear walls limit how much the tower moves in strong wind.
- Safety. They add strength against earthquake forces.
- Fixed layout. Like Mivan walls, shear walls cannot be cut or moved. Treat the floor plan as fixed.
What is an RCC raft foundation
A raft foundation, also called a mat foundation, is a thick slab of reinforced concrete under the whole building. UltraTech Cement explains that it distributes a building’s load over a large area.
Compare it with a simple footing. A footing sits under each column, like a shoe under each foot. A raft is one large slab under everything, like a snowshoe. The weight spreads over more ground, so each square foot of soil carries less.
Why tall buildings use rafts
- Heavy loads. A 63-floor tower is very heavy. A raft spreads that weight.
- Even settling. All buildings settle slightly. A raft helps the tower settle evenly, which protects the structure from cracks.
- Cellars. Skyven has four cellars. A raft at the base forms a solid floor for these deep levels.
The type and depth of a raft depend on the soil. Engineers design it after testing the ground. The Skyven brochure lists an RCC raft foundation but does not give its design details. Ask the developer for the structural design summary and the soil report.
How the three work together
The three parts form one system.
- The raft sits at the bottom and spreads the load into the ground.
- The shear walls rise from the raft and carry vertical and sideways loads.
- Mivan formwork is the method that casts those walls and the floor slabs as one, floor after floor.
The result is a stiff concrete tower. You can read the finishes and fittings that go on top in our Skyven specifications guide.
What this means when you own a Skyven home
Plan changes early. You cannot move walls later. If you want a different use for a room, decide before you move in, and work within the walls.
Plan electrical points. The developer lists points for ACs, TVs and kitchen appliances, and provision for VRV air-conditioning. Check that the points match your furniture plan. Adding points into a concrete wall later is harder.
Ask for as-built drawings. These show where pipes and wires run inside the walls. Keep them for any future repairs or fit-outs.
Use the right tools. Use a hammer drill for concrete and a detector for hidden lines before you drill.
Think about heat. On the west-facing Types III and IV, and on upper floors, concrete walls can store afternoon heat. Our guide on which floor to choose at Skyven covers facing and height.
For a balanced view of the project as a whole, read our Skyven review.
Questions to ask the developer
- Who is the structural consultant, and has the design been peer-reviewed?
- Which seismic and wind codes was the tower designed to?
- What grade of concrete is used, and how is quality tested on site?
- Where are the refuge areas and fire floors?
- Can I get the as-built service drawings for my home at handover?
The developer’s target for handover is December 2028; confirm the latest date with us. The developer calls Skyven South India’s first 63-floor residential tower. Good structure is what lets a tower of that height stand well for decades.
Get the Skyven specification sheet
We are a channel partner for Skyven, not the developer. Send the form and we will share the specification sheet, the floor plans and the latest cost sheet. See the full project on the Skyven homepage.
Sources
- Skyven structure, floors, cellars and specifications: developer’s Skyven brochure. See the Skyven homepage.
- Monolithic concrete construction with aluminium formwork (slab cycle, lead time, limits on alterations, ventilation): BMTPC, Technology Profile of Monolithic Concrete Construction System (PDF), checked October 2026.
- Shear wall definition: Wikipedia, “Shear wall”, checked October 2026.
- Raft foundations: UltraTech Cement, “Raft foundation types and design”, checked October 2026.
Frequently asked questions
What construction technology does Skyven use?
The developer lists three things: Mivan construction, RCC shear wall technology and an RCC raft foundation. Mivan is a system of aluminium formwork used to cast walls and slabs in concrete together.
What is Mivan construction?
Mivan is a common name for aluminium formwork. Workers fix modular aluminium panels on site, then pour concrete for the walls and the floor slab together. The panels are stripped and reused on the next floor.
Can I break or move walls in a Mivan flat?
Generally no. In Mivan buildings most walls are load-bearing concrete. A government technology profile notes that alterations after construction are not possible. Plan your layout changes before you move in.
Are shear walls good for earthquakes?
Shear walls are built to resist sideways forces from wind and earthquakes. The developer describes Skyven's RCC shear walls as earthquake and wind resistant.
What is a raft foundation?
A raft foundation is a thick reinforced concrete slab under the whole building. It spreads the building's weight over a large area of ground and reduces uneven settlement.
Want the Skyven cost sheet?
Get the price sheet, brochure and full floor plans from our team.